Skip to content
20+ Data Centers Worldwide Online within 24 h 24/7 Support

OUR SERVICES

Digital Infrastructure

BOOK A CONSULTATION
Digital Infrastructure Iowa, USA
Since 2017
Leading Crypto Mining Infrastructure Provider
5–50 MW
Target Capacity per Site
End-to-End
From Development to Operation
5 Regions
Americas, Europe, Africa & Asia
Swiss Based
Headquartered in Zug, Switzerland

Artificial Intelligence

POWERED BY
SOVEREIGN-GRADE AI COMPUTE INFRASTRUCTURE
DISCOVER

Consulting & Advisory

BOOK A CONSULTATION
Consulting & Advisory
SECTOR 01
Institutional Sector
Sovereign Funds · Insurance Companies · Asset Managers
SECTOR 02
Finance & Investment Sector
Family Offices · Private Investors · Fund Managers
SECTOR 03
Energy & Infrastructure Sector
Energy Parks · Grid Operators · EPC Partners

HARDWARE & HOSTING

Up and down arrows switch section, right arrow opens it. Bitkern LITE

Hosting Only

BOOK A CONSULTATION

Place your existing fleet inside Bitkern data centers and benefit from professional operations, low-cost power and 24/7 monitoring.

Minimum fleet
From 100ASIC
Locations
20+Worldwide
Hosting from
$0.045/ kWh

Included in hosting

Worldwide Data Centers
Expertise Since 2017
24/7 Security & Technical Support
Tailor-Made Concepts
Transparent Billing
Next-gen ASIC Compatibility

Mining Calculator

BOOK A CONSULTATION

HOW IT WORKS

1 Choose Miner Select Hardware & Hashrate
2 Choose Hosting Rate Rate A or B, Location
3 See the Result Break-even, ROI & Mining Output

Tax Guide

Bitcoin mining offers clear tax advantages that vary by country. Select a country to explore the details.


ABOUT BITKERN

Up and down arrows switch section, right arrow opens it. Company

Bitkern Group

Bitkern Group Zug, Switzerland
Since 2017
Crypto Mining Pioneer
Swiss Based
Headquartered in Zug, Switzerland
20+ Locations
Global Operations
End-to-End
Development to Operation

No open roles right now

No position is currently open. We are growing steadily and always happy to hear from talented people who want to help shape the digital future.

Questions about careers at Bitkern? Write to us at [email protected]

Partnerships & Events

Partnerships & Events FC Luzern, Switzerland
Official Club Partner
FC Luzern, FC Küssnacht, Rigi-See United
13+ Industry Events
From Las Vegas to Hongkong

KNOWLEDGE

Up and down arrows switch section, right arrow opens it. Blog
What is Bitcoin Mining?
Bitcoin mining is the process of validating transactions and securing the Bitcoin network. Specialized computers (ASIC miners) solve complex mathematical problems to add new blocks to the blockchain. Miners are rewarded with newly created Bitcoins and transaction fees.
What distinguishes Bitkern LITE from Bitkern PRO?
Bitkern LITE is mining with guarantees: fully managed operations, a 36-month fixed hosting rate and hardware warranty, ≥99% uptime guarantee and no deposit, starting from a single miner. Bitkern PRO is mining with flexibility: a choice of 20+ hosting locations worldwide, tailor-made concepts, own pool management and a personal contact person, starting from 10 miners.
How does the mining calculator work?
The calculator combines three inputs: the selected hardware with its hashrate, efficiency, and price, the hosting conditions of the chosen product line, and adjustable market assumptions such as coin price and difficulty growth. From these inputs, it projects monthly output, operating costs, and break-even. Beyond the monthly figures, the calculator displays the total BTC mined over the full period for the Mine & Hold and Mine & Sell strategies, together with sale scenarios at various BTC prices.

Since 2017
Leading Crypto Mining Infrastructure Provider
Swiss Based
Headquarted in Zug, Switzerland
5 Regions
Active in South & North America, Europe, Africa & Asia
5-50 MW
Target Capacity per Site
End-to-End Delivery
From Development to Operation
Trusted
By Institutional & Professional Clients Worldwide
FULL-LIFECYCLE PARTNER

Infrastructure for the Compute Era

Bitkern provides hands-on support across all phases. From site evaluation and build-out to long-term operation and exit.

01

Acquire & Develop

  • Site Sourcing From Our Greenfield Pipeline
  • Technical & Commercial Due Diligence
  • Energy and Site Feasibility Check
  • Permits, Zoning and Grid Path Analysis
  • Deal Structuring
Acquire & Develop
02

Build & Commission

  • EPC Oversight
  • Hardware Procurement
  • International Logistics & Customs Clearance
  • QA, Compliance & Safety
  • Commissioning & Handover
Build & Commission
03

Operate & Optimize

  • 24/7 Remote Monitoring
  • Uptime & Efficiency Optimization
  • Transparent Reporting
  • Curtailment Programs for Additional Grid Revenues
  • On-Site Technicians & Repair Coordination
Operate & Optimize
04

Exit & Advise

  • Exit Strategy & Transaction Structuring
  • Buyer Outreach Across Networks
  • Further Usage of Infrastructure for AI Workload
  • Valuation Modeling & Price Negotiation
  • Operational Handover & Transition Support
Exit & Advise
01 Acquire & Develop
Acquire & Develop
  • Site Sourcing From Our Greenfield Pipeline
  • Technical & Commercial Due Diligence
  • Energy and Site Feasibility Check
  • Permits, Zoning and Grid Path Analysis
  • Deal Structuring
02 Build & Commission
Build & Commission
  • EPC Oversight
  • Hardware Procurement
  • International Logistics & Customs Clearance
  • QA, Compliance & Safety
  • Commissioning & Handover
03 Operate & Optimize
Operate & Optimize
  • 24/7 Remote Monitoring
  • Uptime & Efficiency Optimization
  • Transparent Reporting
  • Curtailment Programs for Additional Grid Revenues
  • On-Site Technicians & Repair Coordination
04 Exit & Advise
Exit & Advise
  • Exit Strategy & Transaction Structuring
  • Buyer Outreach Across Networks
  • Further Usage of Infrastructure for AI Workload
  • Valuation Modeling & Price Negotiation
  • Operational Handover & Transition Support
WHY BITKERN

Many Hurdles, One Counterparty

Buyers acquiring a data center in the cryptocurrency mining market face significant challenges. From securing land and power to navigating regulations, ensuring uptime, and managing operational complexity.

CHALLENGE BITKERN SOLUTION
Difficulty sourcing high-quality, shovel-ready or greenfield sites Access to pre-screened, development-ready sites
Uncertainty around grid access, permitting and development timelines Power secured, permits in place, strict project timeline control
Fragmented stakeholders across developers, operators, EPCs etc. Single point of contact with integrated delivery and operations
Limited in-house technical or operational capability Fully managed by Bitkern's expert infrastructure and operations team
Ongoing need to monitor, optimize and maintain hardware & infrastructure Institutional-grade reporting, uptime assurance, SLA compliance
Hardware shortages, long delivery times, supply chain risk Direct supplier partnerships, priority allocation, pre-stocked inventory

OPERATING MODELS

Three Ways to Operate the Data Center

Whether the data center is run as a landlord model, split capacity, or a pure miner, Bitkern offers three distinct approached to match your risk profile, capital structure and operational preference.

01

Hosting Only

Act as a landlord to miners, earning from space and infrastructure usage:

  • Lease data center space to miners
  • Generate steady, contractual revenue from hosting fees
  • Low volatility, infrastructure-as-a-service model

02

Hybrid: Mining + Hosting

Blend stability with upside by splitting capacity between mining and clients:

  • Combine self-mining with hosting
  • Hosting ensures stable cash flow, mining adds upside potential
  • Flexible mix that can be adjusted to market conditions

03

Mining Only

Operate as a pure miner, fully exposed to Bitcoin economics:

  • Deploy the full capacity for proprietary mining
  • Higher upside if Bitcoin price rises
  • Exposed to power costs, network difficulty, and BTC price cycles

STRATEGIC VALUE

The Strategic Value of Owning Bitcoin Mining Infrastructure

High Growth Potential

The demand for HPC for AI and BTC mining is rapidly increasing, offering businesses exposure to fast-growing markets and diversified revenue potential.

Specialized Infrastructure Ownership

Ownership of data centers tailored for HPC and mining gives businesses access to high-value assets, attracting premium clients with specific needs.

Low Correlation with Traditional Markets

The business model shows minimal correlation with traditional markets, like stocks and real estate, offering diversified returns less impacted by market fluctuations.

Stable, Recurring Revenue

The business model generates predictable cash flow through fixed monthly fees, regardless of cryptocurrency price volatility.

FAQ

Everything You Need to Know About Digital Infrastructure

What capacity range does a single Bitkern site cover?

Target capacity runs from 5 MW up to 50+ MW sites. Locations are sourced from a greenfield pipeline with power costs in the range of $0.04 to $0.05 per kWh, spanning five regions across South and North America, Europe, Africa and Asia. 

Digital Infrastructure, Send a Request, Book a Call

How long does it take from site development to operation?

Acquisition and pre-development typically takes 2 to 3 months for technical and commercial due diligence, energy and site feasibility, permits, grid path analysis and deal structuring. Construction and commissioning then runs 3 to 4 months from CapEx commitment to first hashrate. Operation follows for up to 20 years, with a sale option available anytime. 

Digital Infrastructure, Send a Request, Book a Call

How do curtailment and grid programs affect uptime?

Uptime is deliberately flexible rather than fixed at a maximum. Through a flexible approach, a site can actively participate in grid balancing markets and curtail power during peak demand or pricing events, opening up recurring revenue streams while supporting a more resilient grid. Operators can balance core mining against market participation to optimize profitability across both, which means a site may run slightly below maximum uptime by design.

Digital Infrastructure, Send a Request, Book a Call

Does Bitkern keep ownership of the sites?

No. Bitkern develops, builds and operates the facilities throughout the holding period, but the assets are owned by the buyer rather than by Bitkern. Across acquisition, construction, operation and exit, Bitkern acts as a single counterparty, running day-to-day operations while remaining stays with the client. When the asset is to be realized, Bitkern manages the full exit, from buyer outreach and data room preparation to valuation and negotiation.

About Bitkern, Digital Infrastructure, Send a Request, Book a Call

What does end-to-end delivery actually include?

Every phase is handled by one team. Acquisition covers due diligence, feasibility, permits and deal structuring. Construction covers EPC oversight, hardware procurement, logistics, QA and on-time commissioning. Operation covers 24/7 remote monitoring, efficiency optimization, maintenance and transparent reporting. Exit covers buyer outreach, data room, valuation and handover. This removes the fragmentation across developers, operators and EPCs and keeps accountability in a single point of contact.

Digital Infrastructure, Send a Request, Book a Call

Is AI data center infrastructure also available?

Yes, through Castellan, a sister company of the Bitkern Group. Castellan is a European company that develops and operates sovereign AI infrastructure, headquartered in Switzerland with activity across Europe and the United States. It draws on the expertise and experience of the Bitkern Group and on access to more than 5 GW of power capacity.

Artificial Intelligence, Castellan

PARTNER WITH BITKERN

Let's Build Together

Whether you're allocating institutional capital, structuring a fund vehicle or developing your own facility, start with a confidential conversation.

PARTNER WITH CASTELLAN

Interested in AI Infrastructure?

The same physical layer for a different workload. AI data centers demand high-density power delivery, advanced cooling and GPU-ready facilities for training and inference at scale.

High-density Power Advanced Cooling GPU-ready Facilities